Two-Storey Airport Extension
We supplied and erected 675 tonnes of structural steel and purlins for a two-storey extension to the east and west ends of the existing terminal building at Darwin International Airport.
Our ability to fabricate the steel simultaneously at two separate manufacturing facilities enabled us to fast-track the delivery of steel to site. Our scope of works was extended to include the installation of 825 Deltacore pre-cast concrete panels.
We su![]()