T&R Pastoral Meat

Processing Facilities

This project consisted of the design and construction of a 360-square-metre plate freezer building within T&R Pastoral’s operational abattoir at Lobethal

The entire building was suspended to maximise air flow around the insulated floor and walls. Construction teams met with strict hygiene requirements and worked through the Adelaide Hills winter to prepare a 3-metre deep excavation for the building.

We also completed a 250-aquare-metre project at T&R Pastoral’s Murray Bridge abattoir, which included a freezer room, control room, plant room and two-storey office.  Again, the construction site was contained within the abattoir with purpose-built scaffolding, isolating the construction work to allow operations to continue.