The Ahrens team were awarded a project for the Gruyere Gold Mine, one of the largest undeveloped gold deposits in Australia.
The $3.7 million project culminated in a five-month installation of multiple steel clad buildings to service the new gold mine located in Yamarna WA.
With the design completed by Triaxial, fabrication commenced between the Kingsford workshop and Wheatbelt Steel in WA, a part of the Ahrens Group. The project also included the supply and installation of a five-tonne overhead crane in the plant workshop as well as a 30-tonne gold vault by Vault Structures Australia in the Gold Room.
